06/13/2019 - Today was a big and very full day, the Able Sail Toronto docks went into place at NYC, off of the main dock. Many thanks to the hard work of the dock team led by Vice-Commodore - Marine Operations Andrew Barlow. You guys are awesome! 

And there you have it, the docks are in place. Next appropriate day (not raining), planks that were not in place for anchor access get put back into place. Center metal strip between two sections is attached and edge trim goes on. The two davits are installed this Friday at 3pm (receptacles are already installed). The 16 foot ramp with railings gets installed next Wednesday.